Bathroom finished !!!

Finally we have finished the bathroom. Well just a towel rail short but that is proving elusive. We are looking for a swivel telescopic towel rail. they are available in UK for a mere two hundred pounds ($300) so not what we want to spend.

So what we have ended up with is a great large space with fantastic tiling done by our local company Deloraine Carpets. Nathan the owner and Aden the fastidious tiler did a great job with the really good Italian tiles.

The renovations were done by Advantage Carpentry & Joinery. Dean & the guys did a really great job and went out of their way to please.

A custom mirror, vanity and toilet divider by Michael Thomson who did our kitchen and numerous other pieces in the house completed the transformation.

So a reminder of what was and then what is in pictures.

GREEN marble Laminex. Yumm!!!

GREEN marble Laminex. Yumm!!!

vanity & mirror

vanity & mirror

vanity & toilet divider

vanity & toilet divider

mirror

mirror

shower & mirror

shower & mirror

divider

divider

Bathroom blues (er… I mean green)

Well 5 years on from purchasing our house in Westbury, Tasmania we are on the home straight. The last room inside the house to be renovated and probably the most expensive per square meter. THE BATHROOM !!!

Mandy & I had decided early on in the planning stages of the house that we would knock the seperate toilet, short corridor and small bathroom into one good size bathroom that was more in keeping with a four bedroom house.

Original bathroom layout

Original bathroom layout

New bathroom layout

New bathroom layout

So what to do to get there? We decided that the way for us to get the bathroom achieved in a quick-ish way but with a professional result was to do the demolition work ourselves and have the professionals do the re-lining of the walls and floors and the plumbing and tiling.

GREEN marble Laminex. Yumm!!!

GREEN marble Laminex. Yumm!!!

Shower is not up to much

Shower is not up to much

We decided to do the job properly and remove all the plaster and lath on the walls and remove the floor. Starting to talk to builders it took a few discussions to find a builder that would work with us and would do it the way we wanted. Not just a cheap cover up job.

As we had to put the reno through Council we had to have the plans drawn up by a building designer. (thats the rules in Tassie) We used Lateral Building Designs, the same company that drew up the plans for the extension and now good friends.

Whilst talking to Michelle and Richard they mentioned that they had used Deloraine Carpets, 51 Emu Bay Rd, Deloraine, (03) 6362 4374 to do their tiling and they were very happy with the results. Now they are the most local company to us but had not crossed our minds that they did tiling as well as sold tiles. We investigated and had a meeting with Nathan, the owner, who is also a qualified interior designer. We found Nathan’s direct attitude very refreshing and he helped us choose some fantastic tiles. Also he put us on to Dean & Phil from Advantage Tas, local bathroom renovators, based in the Meander Valley.

Dean came and gave us a very reasonable quote so we decided to go ahead.

We started to take the bathroom apart in July, getting the door moved from the original bathroom entrance to the front of the short corridor that we were incorporating into the bathroom. Now we could start creating dust and remove all the plaster and lath. First of all we had to remove the lovely Laminex

Laminex removed

Laminex removed

plaster removed

plaster removed

more plaster removed

more plaster removed

We removed approximately two Hiace van loads of plaster of the walls, and bundle upon bundle of laths which make great dry hardwood kindling.

Next was the floor. The plan was to keep the shower operational until the last minute. In the mean while we rigged up a temporary shower in the Laundry space. It works well and is plumbed into the Washing machine  taps.

Floor being removed

Floor being removed

When we started removing the floor we found that the previous bathroom reno had included cutting through bearers to fit bath plumbing and leaving the bearers just nailed to the floorboards with no visible means of support. Also the toilet had been put in and bearers cut and left supported on a pile of bricks.

All in all there was very little damp and no rot. The shower outlet however had not been connected very well and the grey water from the shower had been leaking into the ground under the house.

We removed the shower and the rest of the floor and then the guys from Advantage came in and started to make good again. The plumbing was re-routed and replaced. A new small hand basin was  put into the second toilet next door.

starting to be put back together again

starting to be put back together again

We decided to use Carter Holt Harvey Plyfloor, which we used for the extension. It is FSC accredited and a great product to work with. On the walls we used cement sheeting.

While we had the walls and floors open we insulated with wool batts in the walls and a polystyrene product that squeezes between the joists and is very easy to fit.

Next stage was waterproofing which happened today. Aiden, the tiler, works for Deloraine Carpets. He also delivered the tiles we had chosen which are massive, 750mm x 450mm italian stone tiles for the floor and one wall.

Any colour as long is it green

Any colour as long is it green

Floor tiles

Floor tiles

The sustainable points of this bathroom are:

  • Insulated walls and floors and ceiling
  • Toilet plumbed into water tanks
  • Water saving shower head 4.5l per minute
  • LED lighting
  • Recycled timber vanity
  • Secondhand vanity sink
  • skylight in South wall letting light into hall
  • Recycled door moved

How the house is behaving thermally !!

Well as we are in the middle of several things at once but not far enough along on any of them to post them I thought I would re visit the steps we have taken to make the house thermally more comfortable than when we moved in nearly four years ago.

This year is the first year that the house stays noticeably warmer inside than the outside temp, even in the morning. Now winter is not here yet but we have had several mornings of below 5 degrees.

Here is a list of improvements we have made and there links to the relevant posts.

Now individually each thing has only helped a little, some more than others, but put together it means that the house is so far consistently warmer than it was and is using less fuel, in this case firewood, to warm it up.